Conduct your excavation process on the land by determining the maximum limits that you can use in filling and cutting. Therefore, obtain the maximum usable area with land-minimum excavation.
Work With Elevation Curves (Isohips)
You can use the plankote studies obtained from the terrain as a base on which you can settle.
Calculate Pile Coordinates and Elevations
Calculate the heights of the piles according to the slopes of the terrain and print them out with coordinates. Thus, discover how many tonnes of steel you can save on south sloping terrain.
Install PVSYST PAN File
You can upload the PVSYST compatible PAN file provided by your module manufacturer to pvX and design.