For EPC Contractors
Design for constructability from day one
Late-stage grading changes are expensive, avoidable, and usually traceable to one root cause: terrain wasn't in the loop during design. PVX.AI puts civil engineering first so EPC teams deliver construction-ready packages without rework.
Request a Demo + Free Trial
Unbuildable designs show up at the worst possible moment.
Grading changes discovered during detailed engineering, or worse, during construction, are among the most expensive problems in utility-scale solar. When layout is done on flat-terrain assumptions, civil engineers are left to adapt designs that weren't built for real terrain. The result: change orders, schedule slippage, and eroded margins.
Civil-first design that holds through construction
Civil-first design
Grading analysis happens before layout, not after. Earthwork volumes, cut/fill balance, and slope limits are constraints on panel placement from the start, not surprises discovered later.
Grading cost reduction
Compare multiple grading strategies before committing to one. PVX.AI's multi-scenario approach has delivered $727K in earthwork savings on a single project by finding the optimal cut/fill balance.
Fewer change orders
When design and civil are resolved in the same environment before IFC, the downstream handoffs are cleaner. Less rework for your civil sub. Less exposure for your project team.
Construction-ready exports
Deliver DWG, DXF, and LandXML files that civil contractors can use directly. No translation layer, no lost precision. Just design-to-field continuity.
$727K
"Same site. Same panels. $727K less in earthwork."
Case Study: Earthwork & Tracker Optimization
From terrain analysis to construction package
Grading analysis with cut/fill volumes in AutoCAD
Construction-ready exports: DWG, LandXML, PVsyst, CSV
See PVX.AI in action
Watch how solar engineers use PVX.AI to cut earthwork costs and shorten cable runs before breaking ground.
"PVX.AI cut our engineering time in half while improving layout precision. On hilly terrain, the automated pile length and slope checks eliminated manual iteration entirely."
Hakan Ozen
Structural & AEC Engineer · ISOTEC
See PVX.AI on your terrain data
15-minute walkthrough with your DWG file. We run grading, layout, and cable routing live on your actual site. No pitch deck.